KM Group Logo

Our Projects

3
Ongoing Projects
32
Completed Projects
25+
Districts Served
1982
Since we served

Ongoing Projects

Active infrastructure development across Nepal

Completed Projects

32 successfully delivered infrastructure projects

Baunne Khola Bridge

Kolte Mainatar, Udayapur

Type: Bridge Construction

Structure: RCC Prestress Bridge with Pile foundation

Span: 72.1m

Completed

Pedestrian Overhead Bridge

Srijanachowk, Pokhara

Type: Footbridge

Structure: Urban pedestrian bridge

Span: N/A

Completed

Rasuwa Khola Dhunge Bridge

Rautamai Rural Muncipality-2, Udayapur

Type: Bridge Construction

Structure: RCC Prestress Bridge with Pile foundation

Span: Single Span , 30 Length Bridge

Completed

Tadi Khola Bridge

Samundratar Balkumari

Type: Bridge Construction

Structure: Prestressed Concrete Bridge

Span: 65m

Completed

Yari Khola Bridge

Udayapur

Type: Bridge Construction

Structure: RCC Prestress Bridge with Open foundation

Span: 60m

Completed

Budi Khola Bridge

N/A

Type: Bridge Construction

Structure: Prestress RCC Bridge with Open foundation

Span: 35m

Completed

Sisne Khola RCC Bridge

Milanchowk Sapanwati Rumjatar Road

Type: Bridge Construction

Structure: Prestress RCC Bridge, Single Span

Span: 37.45m

Completed

Bhalu & Miya River Bridge

Khotang

Type: Bridge Construction

Structure: RCC Bridge with Open foundation

Span: 20m x 2

Completed

Badighat Khola Bridge

Bhimgithhe Darling Road, Baglung

Type: Bridge Construction

Structure: 58m long Prestress Box Girder Bridge with open foundation

Span: 58m

Completed

Damari Khola Prestress Bridge

Dumkibas Kaltadi Deurali Road, Nawalparasi

Type: Bridge Construction

Structure: RCC Prestress Bridge

Span: 30m

Completed

RCC Bridge over Bhusudi Khola

Jhapa

Type: Bridge Construction

Structure: RCC Bridge with Pile foundation

Span: 26.20m

Completed

Bridge Superstructure of Rawa 2 Khola Bridge

N/A

Type: Bridge Construction

Structure: Steel plate continuous girder type with RCC deck slab

Span: 60.60m, lane width 6m

Completed

Road Safety Works

Koshi Ithari Dhankuta Section

Type: Infrastructure

Structure: Crash Barrier installation (1793.55m)

Span: 1793.55m

Completed

Reconstruction of Office/Barrack Building

Aeiselukharkha, Khotang

Type: Building Construction

Structure: Mess Toilet Block, Septic tank and soakpit works

Span: N/A

Completed

Healthpost Building

Gwalichaur, Baglung

Type: Building Construction

Structure: Construction of Healthpost Building

Span: N/A

Completed

Office Building of Sarkari Wakil Office

Inaruwa, Sunsari

Type: Building Construction

Structure: Office Building Construction

Span: N/A

Completed

Transmission Line Works

Chaju Khola, Chulachuli Illam

Type: Infrastructure

Structure: Pile Foundation Protection at Tower no 20, Damak Godak 132kV Transmission Line

Span: N/A

Completed

Baidanath Khola Bridge

Udayapur

Type: Bridge Construction

Structure: RCC Prestress Bridge with Pile foundation

Span: 84.2m

Completed

Thalaha Khola Bridge

Sunsari

Type: Bridge Construction

Structure: RCC Bridge with Pile foundation

Span: N/A

Completed

Kalodiya (Lodiya) Khola Bridge

Illam

Type: Bridge Construction

Structure: RCC Prestress Bridge with Open foundation

Span: 112m

Completed

Kharte Khola Bridge

Okhaldhunga

Type: Bridge Construction

Structure: RCC Bridge, Sub Structure works

Span: N/A

Completed

Geuriya Khola Bridge

Gauriganj Khajur Gachhi Road, Jhapa

Type: Bridge Construction

Structure: Cast in Situ two-webbed reinforced concrete Bridge with pile foundation

Span: 25m x 2 spans

Completed

Devniya Khola Bridge

Jhapa

Type: Bridge Construction

Structure: Prestressed Concrete Bridge with pile foundation

Span: 40m x 2 spans

Completed

Manoharghat Bridge

Tokha, Kathmandu

Type: Bridge Construction

Structure: RCC Bridge with Pile foundation

Span: 15m

Completed

Modular Bridges

Golmagad Khola Doti and Baugi Khola Parsa

Type: Infrastructure

Structure: Modular Prestress Bridges

Span: 25m and 20m

Completed

RCC Bridge over Kurung Khola

Jhapa

Type: Bridge Construction

Structure: RCC Bridge with Pile foundation

Span: 20m

Completed

RCC Bridge over Geuria Khola

Jhapa

Type: Bridge Construction

Structure: RCC Bridge with Pile foundation

Span: 20m

Completed

Sarada River RCC T Beam Girder Bridge

Kharibot Road, Salyan District

Type: Bridge Construction

Structure: RCC T Beam Girder Bridge with open foundation

Span: 22m

Completed

Gideri Khola Bridge

N/A

Type: Bridge Construction

Structure: Design and Build Model

Span: 40m

Completed

RCC Fixed Frame Bridge

Manamaiju, Kathmandu

Type: Bridge Construction

Structure: RCC Fixed Frame Bridge with Pile foundation

Span: 20m

Completed

Balfore Betty Steel Bridges

Over Trisuli River and Bhotekoshi River, Trisuli Somdang Road

Type: Bridge Construction

Structure: Steel Bridges

Span: Multiple spans

Completed

Multiple RCC Bridges

Various locations

Type: Bridge Construction

Structure: Dondawa (72m span), Gang (36m span), Bhada (66m span)

Span: Multiple spans

Completed

Bench Development & Permanent Access Road

Phaksinda Complex, near Dam site of Arun 3 HEP

Type: Road Construction

Structure: Permanent Access Road Construction

Span: N/A

Completed

Retrofitting Works

Singhdurbar Project Building

Type: Building Renovation

Structure: Structural retrofitting of government building

Span: N/A

Completed

Vocational Training Centre

Khokana

Type: Building Construction

Structure: Construction of Vocational Training Centre

Span: N/A

Completed

Our Engineering Approach

Specialized solutions for Nepal's unique terrain

Bridge Engineering

Expertise in RCC Prestress bridges, pile foundations, and modular solutions

Infrastructure Development

Comprehensive solutions for roads, buildings, and safety installations

Nationwide Implementation

Projects delivered across diverse terrains from Jhapa to Doti

Partner With Us On Your Next Project

Our expertise in complex infrastructure projects ensures quality and precision